FlowGearSourcePumps, valves, fittings, and process equipment for global sourcing
Get Accurate Data Recording with SUP-R1200 Chart Recorder - Direct from Factory
Electrician And Automation Instrument

Get Accurate Data Recording with SUP-R1200 Chart Recorder - Direct from Factory

Flow-control detail pages should help buyers judge whether one pump, valve or instrumentation record truly fits the process line before RFQ.

Quote on request

Product sourcing profile

CategoryElectrician And Automation Instrument
Inquiry workflowPlatform RFQ workflow
AvailabilityInquiry required
Updated2026-05-06

Product introduction

PRODUCTS DETAILS Specification Product Paper recorder Model SUP-R1200 Display LCD display screen Input Voltage:-5)V/-5)V/-20)mV/-100)mV Electric current :-10)mA/-20)mA Thermocouple: B,E,K,S,T Thermal resistance: Pt100, Cu50, Cu100 Output Up to 2FlowGearSource curates RFQ-led product discovery for buyers looking for instrumentation options. The page is organized around specification review, application fit, and inquiry-ready comparison.When evaluating this product, buyers should confirm application fit, required performance range, installation environment, lead time, documentation, and whether the supplier can support OEM or project quotations. Current vertical focus: flow control equipment sourcing, industrial pump and valve discovery, and rfq-ready process supply platform.pressure transmitter

Selection and RFQ points

Review material fit, application context, alternatives and RFQ detail before comparing related product paths.

Material fit Electrician Automation Instrument

Confirm material, size, finish, tolerance and processing needs before price comparison.

Application fit application, operating environment and usage frequency

Add the target application and operating context so related products can be compared correctly.

Alternative path Flow Control Equipment

Use nearby materials, equipment types or category pages when this record is close but not exact.

RFQ detail Quantity, destination, timing

Include quantity, destination, target delivery window, packaging and any technical constraints.

FlowGearSource quality checks

Process conditionConfirm whether media, pressure and operating context match the intended process line.

Use this check before moving from discovery into product comparison or RFQ submission.

Line roleCheck whether the product sits at the right place in the pump, valve or instrumentation path.

Use this check before moving from discovery into product comparison or RFQ submission.

RFQ detailBring flow, pressure, material and connection requirements into the inquiry.

Use this check before moving from discovery into product comparison or RFQ submission.

Key specifications

CategoryInstrumentation
BrandGet Accurate Data Recording with SUP-R1200 Chart Recorder-Direct from Factory
Unitset
ApplicationFood and beverage processing
CategoryInstrumentation
Chart speed10mm/h-1990mm/h
CommunicationRS 232/RS485 (need Customization)
DIN panel cutout138*138mm
DisplayLCD display screen
Feature Highlightsprecision
InputVoltage:-5)V/-5)V/-20)mV/-100)mV Electric current :-10)mA/-20)mA Thermocouple: B,E,K,S,T Thermal resistance: Pt100, Cu50, Cu100
Matched Termspressure transmitter
ModelSUP-R1200
OutputUp to 2 current output channels( 4 to 20mA)
Power supply220VAC;24VDC
Precision0.2%FS
ProductPaper recorder
Product TitleGet Accurate Data Recording with SUP-R1200 Chart Recorder-Direct from Factory
Sampling period600ms
Shorter mounting depth144mm

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Related keyword paths

Grouped by the product keyword that generated the related path.

SOURCING DECISION BRIEF

Get Accurate Data Recording with SUP-R1200 Chart Recorder - Direct from Factory sourcing decision brief

Flow-control detail pages should help buyers judge whether one pump, valve or instrumentation record truly fits the process line before RFQ.

Category
Instrumentation
Price status
Quote on request
Inquiry model
Structured product RFQ with quantity, destination and technical requirements.
Availability
Confirm by inquiry
Sourcing lens
Process-fit product decision
Primary compare
Category, Brand, Unit
Adjacent category
Flow Meters and Instrumentation
Next route
Industrial Pumps for Food and Beverage Processing
Buyer checklist
  • Process fit: Check media, flow, pressure and line role before moving beyond this detail page.
  • Mechanical match: Compare material, connection and maintenance requirements against the target process environment.
  • RFQ handoff: Carry process conditions and installation context into the inquiry instead of sending only the product title.
How should buyers use this FlowGearSource detail page?

Use the detail page to confirm whether the product truly fits the target process line before opening a sourcing request.

What should buyers compare first?

Compare media compatibility, pressure range, connection style and the nearest process application route.

FlowGearSource related sourcing paths

FlowGearSource procurement phrases

FlowGearSource project-fit checks

Material Confirm Material before comparing offers or moving the inquiry forward.
Flow Rate Confirm Flow Rate before comparing offers or moving the inquiry forward.
Pressure Confirm Pressure before comparing offers or moving the inquiry forward.
Connection Type Confirm Connection Type before comparing offers or moving the inquiry forward.
Application route Use Application to compare adjacent options instead of relying on one broad title match.
Country route Use Country to compare adjacent options instead of relying on one broad title match.

FlowGearSource related product samples

Process-fit sourcing method

Process fitCheck flow duty, media compatibility and line role before sending any RFQ.
Operating contextUse pressure, connection and maintenance expectations to narrow the product family.
RFQ framingBring flow rate, pressure range and installation environment into the sourcing request.

Procurement notes

If visible specifications are still thin, add model, material, interface, quantity, application fit, destination and target lead time before comparing quotes.

Next sourcing actions